SPQ-LP-001 · Rev 1.0 Plant operations suite · Automotive tier-1 / tier-2 Gurugram · 28.46° N 77.03° E IST --:--:--
SPQ-00Connected plant-operations suite

Your plant, paperless and audit-ready.

Every check, approval and change signed, timed and traceable.

One connected system from the shop floor to the boardroom, wired to your machines by the same team that builds the software.

08
Connected pillars
20
Modules
HI+EN
Operator app
0
Data lost · store & forward
Fig. 01 — Line 3 · MouldingLive · Shift A
OEE · Line 3C-01
84.2%
First-pass yieldC-02
98.7%
Open CAPAsC-03
07open
Traced todayC-04
12,481
Visitors on siteC-05
14approved
Machines onlineC-06
46/ 48
Src PLC-03 → GW-01 → SPQIllustrative values
Applications / 04

Trusted by automotive tier-1 and tier-2 suppliers.

PRC-01Injection mouldingShot counters, mould PM, cycle time, start-up checks
PRC-02PlatingBath and oven temperature, current, rework tracking
PRC-03WeldingWelding current, cycle monitoring, interlocks
PRC-04AssemblyPoka-yoke, 4M change, dispatch lock
SPQ-01Problem · Before / AfterSheet 01 / 08

Paper records the problem. A connected plant prevents it.

Disconnected systems, paper check sheets and data nobody can trace leave plants running blind and fixing quality after the fact. Here is what changes, line by line.
Parameter
Before · paper & spreadsheets
After · Silver ProtoQoL
BA-01Check sheet signed
Illegible initials, back-filled at shift end
E-signed by badge, 06:02:14 IST
BA-02Failed check item
A note in the margin, rarely actioned
Action raised with an owner, alert sent in seconds
BA-03Mould maintenance
Done when someone remembers
Due by time or shot count, whichever comes first
BA-04Operator at the machine
Anyone can press start
Unqualified operator refused at the machine
BA-05Wrong part at dispatch
Found by the customer
Dispatch lock: the wrong part can't leave the gate
BA-06Tracing a defect
Days in registers and spreadsheets
Part-level digital birth certificate, one scan away
BA-07Network drop
Readings lost for good
Store-and-forward: 0 readings lost
BA-08Shift report
Typed up the next morning
PDF shift report, sent automatically
BA-09Audit preparation
Weeks of chasing files
Full audit trail: who, what, when and why
Tbl. 01 — Shop-floor record, paper vs connectedTimestamps illustrative
SPQ-02Platform indexSheet 02 / 08

Eight pillars. Twenty modules. One source of truth.

Every pillar shares its records with the rest. A failed check raises an action, the action is tracked to closure, and every step lands in the same audit trail. Open a row to see what it covers.
No.Part no.PillarCoversFn.
  • MES.01Shift & daily production reports
  • MES.02Plan vs actual
  • MES.03OEE & downtime by reason
  • MES.04Hidden idle time
  • MES.05Machine start-up check sheets on tablets; a failed item raises an action
  • MES.06Production planning
  • MES.074M change management
  • MES.08Assembly poka-yoke
  • MES.09Operator performance
Used byProduction · Operators · Plant headInterfaceTablet, desktop, wall display
  • QMS.01Incoming inspection (AQL / c=0 sampling)
  • QMS.02In-process & pre-dispatch inspection
  • QMS.03SPC: I-MR, X-bar R, EWMA, CUSUM
  • QMS.04Red-bin rejection Pareto
  • QMS.05CAPA, 8D & 5-Why
  • QMS.06Customer & supplier complaints
  • QMS.07Supplier rating & PPM
  • QMS.08Control plan / PFMEA
Used byQuality · Production · StoresLinks toAudits, Stores, Alerts
  • AUD.01Internal, process, product & dock audits
  • AUD.02LPA & 5S audits
  • AUD.03Supplier and customer / OEM audits, incl. VSA
  • AUD.04Audit reports
  • AUD.05Document control with revisions
  • AUD.06E-signed approvals
  • AUD.07Full audit trail, designed to 21 CFR Part 11 / ALCOA+ principles
  • AUD.08IATF 16949-aligned
  • AUD.09APQP / PPAP
  • AUD.10Calibration & MSA
Used byQuality · Auditors · Plant headLinks toQMS, Documents, People
  • MNT.01Equipment & mould registry with shot counters
  • MNT.02Preventive maintenance by time or counter, whichever comes first
  • MNT.03Machine & mould history cards
  • MNT.04Breakdowns with MTTR / MTBF
  • MNT.05Critical spares
Used byMaintenance · ProductionFed byShot counters via PLC
  • WMS.01Store management
  • WMS.02Warehouse management
  • WMS.03QR bin tagging & FIFO
  • WMS.04Stock movements logged by operator and time
  • WMS.05Dispatch lock: the wrong part can't leave
  • WMS.06Part-level digital birth certificate
  • WMS.07Rework tracking
  • WMS.08Labels & gate passes
Used byStores · Dispatch · QualityPrintsIn your own label formats
  • IOT.01PLC / HMI integration
  • IOT.02Sensor retrofits
  • IOT.03Store-and-forward telemetry: no data lost when the network drops
  • IOT.04Interlocks
  • IOT.052D digital twin
  • IOT.06Oven, welding, pressure, current & cycle-time monitoring
  • IOT.07Process automation & workflows
  • IOT.08ERP / SAP connectors
Used byMaintenance · Production · ITBuilt byThe same team as the software
  • ALR.01Email alerts
  • ALR.02Phone / SMS alerts
  • ALR.03WhatsApp alerts
  • ALR.04Escalation matrix
  • ALR.05Automated PDF shift reports
  • ALR.06"My work" inbox of open actions, checks and approvals
Used byEveryone on the escalation matrixTriggered byAny pillar
  • PPL.01Operator qualification check: an unqualified operator is refused at the machine
  • PPL.02Skill matrix & training (Dojo)
  • PPL.03Visitor management: gate entry, passes, host approval
  • PPL.04EHS
  • PPL.05Multi-plant dashboards
Used byHR & training · Security · EHS · Plant headLoginBadge or QR
SPQ-03Plant tour · Digital twinSheet 03 / 08

Walk the line, station by station.

One shift through a sample plant: from the visitor at the gate to the report in the boardroom. Every station runs on the same record.

Fig. 03 — Sample plant · IsometricStation Overview

01Gate & visitorsVMS · EHS

Every visitor, known at the gate.

Gate entry, passes and host approval in one flow. Safety induction is confirmed before anyone reaches the shop floor, and the visitor log is always ready for an audit.

Visitor pass · V-0428On site
Host
Quality head
Zone
Hall 2 · Moulding
In
09:42 · Gate 01
PPE
Shoes · glasses
Gate entryHost approvedInduction donePass printed

02Stores & warehouseQR bins · FIFO

Every bin tagged. Every move logged.

QR bin tagging with FIFO, stock movements recorded by operator and time, and a digital birth certificate that follows each part from incoming inspection to the truck.

Scan · bin A-14FIFO OK
Material
PP granules
Lot
2611-07 · oldest
Incoming
AQL passed
Moved
Op. 118 → Line 3
Time
10:14:32

03Machines & IoTMES · PLC

Machines that report for themselves.

PLC and sensor retrofits stream cycle time, temperature, pressure and current. OEE and downtime by reason update live, and an unqualified operator is refused at the machine.

IMM-07 · Line 3 — Moulding · Shift ARunning
84.2%OEE
Availability91.0
Performance95.4
Quality97.0
Cycle28.0 s
Zone 3228 °C
Inj. press.1,140 bar
RefusedOp. 131 not qualified for IMM-07

04Quality gateQMS · SPC

The line stops before the defect ships.

Live SPC (I-MR, X-bar R, EWMA, CUSUM) watches every critical dimension. When a point breaks the control limit, the interlock holds the line and a CAPA opens with the evidence attached.

X-bar · wall thickness 2.0 mmn = 5
UCLCLLCL 1.902.10 mm
Interlock firedLine 3 held · CAPA-0193 opened

05DispatchDispatch lock

Nothing wrong leaves the dock.

Every carton is scanned against the dispatch plan. A mismatched part number, a held lot or a missing inspection stops the load, and labels and gate passes print in your own formats.

Dock 02 · Truck HR-55 · Load 3/6Locked
PlanPart 7731-A · qty 480✓
PDIPre-dispatch inspection✓
ScanPart 7731-B · lot 2611-04✕
Wrong part. Blocked.Gate pass held · supervisor notified

06BoardroomReports · alerts

The boardroom sees what the floor sees.

Multi-plant dashboards, audit status and automated PDF shift reports, with alerts by email, SMS and WhatsApp that escalate until someone acts.

Alerts · plant headMy work · 3 open
WhatsApp · Line 3 heldSPC out of control on wall thickness. CAPA-0193 opened.
SMS · Dock 02 lockedWrong part scanned on load 3. Gate pass held.
Email · Shift A report (PDF)OEE 84.2% · 2 alerts · 3 open actions.
SPQ-04Shop floor · Operator tabletSheet 04 / 08

06:00, Line 3. The start-up check that can't be skipped.

Operators work on a tablet in Hindi or English, offline if the Wi-Fi drops. The check sheet doesn't just record a problem; it stops the machine and tells the right people.

  1. 01Badge in

    The operator scans a badge. The system checks the skill matrix: an unqualified operator is refused at the machine.

  2. 02Tick the sheet

    Each item has its method and limit on screen. Every tick is attributable and timed to the second.

  3. 03One item fails

    The safety-gate interlock fails. An action is raised with an owner, and machine start stays blocked.

  4. 04Alert sent, sheet signed

    Maintenance gets WhatsApp and SMS within seconds; if it stays open, it escalates. The operator e-signs the sheet.

Start-up check sheet
Offline-ready
IMM-07Line 3 — MouldingMould M-14Shift AStart blocked · ACT-0412
IDScan badge to begin…Operator #2207 · Qualified for IMM-07 (L3)06:00:41
  1. 01
    Hydraulic oil level within markVisual · sight glass
    OKNG
  2. 02
    Mould clamping bolts tightTorque check
    OKNG
  3. 03
    Cooling water flow ≥ 12 L/minFlow meter
    OKNG
  4. 04
    Dryer temperature 80 ± 5 °CHMI reading
    OKNG
  5. 05
    Safety gate interlock workingOpen gate, attempt cycle
    OKNG
  6. Action raised · ACT-041206:01:58Safety gate interlock not respondingOwner: Maintenance · Priority high · Start blocked until closed
  7. 06
    Nozzle heater band OKVisual
    OKNG
  8. 07
    Emergency stop testedFunction test
    OKNG
  9. 08
    First-off part approvedQuality sign-off
    OKNG
8 / 8 checked · 1 NG
Sign & submitE-signed · 06:02:14 IST
Alert sent · L106:01:59
  • WhatsApp → Maintenance supervisor Sent
  • SMS → Shift in-charge Sent
  • Email → Quality Sent

Escalates to the plant head if still open in 30 min.

Fig. 04 — Operator tablet · Step 04 / 04
SPQ-05Hardware · Signal pathSheet 05 / 08

We wire the machines. Then we build the software.

PLC and HMI integration, sensor retrofits and edge gateways come from the same team that writes the application. Telemetry is stored and forwarded, so a network drop costs you no data.
TitleSignal path · Line 3 · Moulding
Dwg no.SPQ-IOT-01
ScaleNTS
Rev04
Sheet05 / 08
Link GW-01 → ServerOK
Readings buffered0
Readings lost0
Last event—
  • IOT.01PLC / HMI integration, on existing machines or retrofits
  • IOT.02Sensor retrofits for oven, welding, pressure, current and cycle time
  • IOT.03Store-and-forward telemetry: zero data loss when the network drops
  • IOT.04Interlocks that stop a machine, not just report it
  • IOT.052D digital twin of the line, live
  • IOT.06Process automation, workflows and ERP / SAP connectors
SPQ-06Compliance · Audit trailSheet 06 / 08

Audit-ready on any given shift.

Every record is attributable, timed to the second and kept with its full history. Designed to 21 CFR Part 11 and ALCOA+ principles, and aligned to IATF 16949.
Control plan · Controlled documentInjection moulding — Housing, 2-cavity
Doc no. / RevCP-IMM-07 / 04
LineLine 3 — Moulding
Machine / MouldIMM-07 / M-14
LinkedPFMEA-07 · MSA-118
Rev 03→04Cycle-time upper limit revised after process validation. Linked PFMEA updated; previous revision retained, not overwritten.
#CharacteristicSpecMethodFreq.
1Wall thickness2.0 ± 0.1 mmGauge CAL-1185 / 2 h
2Cycle time28.0 ± 0.5 sPLC-03, autoContin.
3Short shot / flashNilLimit sample100 %
PreparedQA engineerE-signed · 09:18:33 IST
ReviewedProduction headE-signed · 11:02:47 IST
ApprovedQA headE-signed · 14:22:08 IST
Audit trail · IMM-07 · Shift ATbl. 02 — Read-only · Illustrative entries
Time (IST)UserActionRecordReason / note
06:00:41Operator #2207Badge loginIMM-07 · qualification verifiedSkill matrix L3
06:01:58SystemAction raisedACT-0412 · Safety gate interlockCheck item 05 = NG
06:01:59SystemAlert sentWhatsApp + SMS → MaintenanceEscalation matrix L1
06:02:14Operator #2207E-signedStart-up check sheet · IMM-077 OK · 1 NG
06:31:07Maintenance technicianClosedACT-0412Limit switch replaced
06:33:40Shift in-chargeVerifiedIMM-07 releasedInterlock re-tested
09:18:33QA engineerRevisedCP-IMM-07 · Rev 03 → 04Cycle-time limit
14:22:08QA headApproved · e-signCP-IMM-07 · Rev 04Released to line
SPQ-06.2Compliance · General specificationSheet 06 / 08

Built to stop errors, not just report them.

Locks, interlocks and refusals at the machine, the gate and the dispatch dock. Then a record of every one of them.

S.01
Scope
8 connected pillars, 20 modules, from incoming material to dispatch
S.02
Error-proofing
Interlocks, dispatch lock, poka-yoke, operator qualification refusal
S.03
Hardware
PLC / HMI integration, sensor retrofits and gateways, wired by our own team
S.04
Telemetry
Store-and-forward; zero data loss on a network drop
S.05
Operator app
Tablet app, works offline, badge or QR login
S.06
Languages
Hindi + English
S.07
Records
Every action signed, timed and traceable, with a full audit trail
S.08
Reports
Prints in your own formats; automated PDF shift reports
S.09
Masters
Excel import of your existing masters
S.10
Alerts
Email, phone / SMS and WhatsApp, with an escalation matrix
S.11
Scale
Start with one machine, scale to the plant; multi-plant with data separation
S.12
Integration
ERP / SAP connectors
SPQ-07Rollout · How it worksSheet 07 / 08

Start with one machine. Scale to the plant.

No big-bang cut-over. We go live where the pain is, prove it on the line, then extend.
  1. 01Step

    Walk the plant

    We walk your lines with production, quality and maintenance, and map every check sheet, register and machine signal.

    Output: process & signal map
  2. 02Step

    Connect the machines

    PLCs, HMIs and sensor retrofits wired to an edge gateway. Existing masters come in from Excel.

    Output: live machine data
  3. 03Step

    Go live module by module

    One module at a time, on one line first, in your own print formats. Operators train on the tablet in Hindi or English.

    Output: first module in use
  4. 04Step

    Scale across plants

    Add lines, then plants, with dashboards across all of them and each plant's data kept separate.

    Output: multi-plant view
SPQ-07.2Rollout · SequenceSheet 07 / 08

Ten stages, in an order that holds.

Each stage builds on the masters and records of the one before, so the data is clean from day one and nothing has to be keyed twice.
  1. R-01Foundation mastersParts, machines, moulds, operators, suppliers
  2. R-02Incoming qualityAQL / c=0 sampling at the gate
  3. R-03ProductionReports, OEE, check sheets
  4. R-044M changeMan, machine, material, method
  5. R-05QMSSPC, CAPA, 8D, complaints
  6. R-06Maintenance & toolsPM by time or shot count
  7. R-07Customer qualityComplaints, PPM, OEM audits
  8. R-08Calibration & MSAGauges, studies, status
  9. R-09APQP / NPDPPAP, control plan, PFMEA
  10. R-10Dashboards & analyticsPlant and multi-plant views
Fig. 05 — Rollout sequence · 10 stagesOrder can flex per plant
SPQ-08ContactSheet 08 / 08

See it on your own shop floor.

We'll walk one line with your team, show you where the paper goes and what the first module would look like, wired to your machines.

Or write to aks@silverprotoqol.com · call +91 95822 13331